English (United States) Italiano (Italia) Français (France) Português (Brasil)   Login    Register    Thursday, February 23, 2012      Search  

Bard (Itália) HYDRO-ELECTRIC PLANT

Minimize
                      


Location Bard (AO)-Italy
Contract authority CVA
Amount 900.000 Euro
End of work: 05/2009
Description Supply and installation of electromechanical equipment       
  • Weir 
    • N.2 radial gates 20.700x2.300 mm
    • N.1 radial gate 20.700x1.500 mm with overlying flap 20.000x500 mm
  • Gate controls
    • Hydraulic power unit with stainless steel pipings
    • Electric control cabinet
    • PLC for automatic upstream level control
The hydroelectric plant of Bard is situated in the commune of Bard, in the province of Aosta, it is situated on the river auction of the river Dora Baltea 



    CustomersReference ListIngula (South Africa)Kef Eddir (Algerie)Bard (Italia)Caoria (Italia)Ridracoli (Italia)Photo gallery
Copyright 2010 by Webbo    Privacy Statement   
Calzoni Hydro S.p.a. 40069 Zola Predosa (Bologna) Italia - Via dei Lombardi 3/a - Tel. (+39) 051.751556-Telefax (+39) 051.753629 info@calzonihydro.it P.I. 02504381209